Registro completo de metadados
Campo DCValorIdioma
dc.contributor.advisorMelo, Paulo Fernando Ferreira Frutuoso ept_BR
dc.contributor.authorMaia, Yran Leite-
dc.date.accessioned2023-02-28T14:03:15Z-
dc.date.available2023-02-28T14:03:15Z-
dc.date.issued2022-
dc.identifier.urihttps://www.repositorio.mar.mil.br/handle/ripcmb/845914-
dc.descriptionA construção do primeiro submarino brasileiro com propulsão nuclear (SN-BR) está prevista para começar em 2022. Ao final da vida operacional do SN-BR, seu combustível nuclear retirado de bordo e ele será descomissionado. Durante o processo de descomissionamento o compartimento do reator (RC) é separado do resto do casco e enviado para uma instalação de armazenamento provisória. Caberá à Marinha do Brasil (MB) projetar e construir uma instalação capaz de garantir o armazenamento seguro do compartimento do reator por cerca de 50 anos para permitir o decaimento dos radio nuclídeos de ativação existentes neste compartimento. O primeiro passo para a obtenção dessa instalação é selecionar o local (sítio) onde ela será construída. Para solução deste problema esta Tese propõe um processo de seleção de sítios baseado no Processo Analítico Hierárquico (AHP) que considera a base normativa nacional (ambiental e nuclear), as especificidades dos meios navais e as restrições logísticas impostas ao transporte do compartimento do reator. A validação do processo de seleção de sítios proposto foi realizada por um estudo de caso que foi capaz de identificar seis locais que atendem aos critérios estabelecidos e de hierarquizá-los em função do seu grau de atendimento a estes critérios.pt_BR
dc.description.abstractThe construction of the first Brazilian Nuclear-Powered Submarine (SN-BR) is scheduled to begin in 2022. At the end of its operational life, the submarine will be defueled and decommissioned. During the decommissioning process the reactor compartment (RC) is separated from the rest of the hull and sent to a temporary storage facility. Thus, Brazilian Navy (MB) has to design and build a facility capable of safe storing the RC for about 50 years to allow the decay of the activation radionuclides existing within this compartment. The site selection for the construction of the interim storage facility is one of the first step required to be performed. The purpose of this thesis is to propose a site selection process for the RC interim storage facility in Brazil. This site selection process is based on an Analytic Hierarchy Process methodology that takes into account nuclear and environmental national regulations, naval and shipyard specificities, and logistics constraints. The validation of the proposed site selection process was carried out by a case study that was able to identify six candidate sites that meet the established criteria and to rank them according to their degree of compliance with these criteria.pt_BR
dc.language.isopt_BRpt_BR
dc.publisherUniversidade Federal do Rio de Janeiro (UFRJ)pt_BR
dc.rightsopenAccesspt_BR
dc.subjectDescomissionamentopt_BR
dc.subjectSubmarinos nuclearespt_BR
dc.subjectDepósito temporário de rejeitos radioativospt_BR
dc.subjectSeleção de sítiospt_BR
dc.titleAn Approach for the Site Selection of an Interim Storage Facility for the Reactor Compartment of the Decommissioned Brazilian Nuclear Submarinept_BR
dc.typedoctoralThesispt_BR
dc.subject.dgpmEngenharia nuclearpt_BR
Aparece nas coleções:Engenharia Naval: Coleção de Teses

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
AN APPROACH FOR THE SITE SELECTION 2023_01_18.pdf1,9 MBAdobe PDFThumbnail
Visualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.